BIM IMPLEMENTATION
BIM implementation in commercial projects
Working with what the client provides
The projects began with prototypes and digital models provided by Walmart. Receiving a Revit starting point helped identify the type of store, but it did not mean every discipline was already resolved. Some furniture elements had considerable geometric detail, while architectural, structural, building services, and exterior components still needed to be developed or adjusted for each location. Part of the support therefore involved reviewing what could be reused from the prototype, what needed to be completed, and how to organize information so people from different disciplines could work from compatible references. It was not a matter of copying files from one project to another, but of identifying which model conditions could serve as a working foundation.
Establishing criteria while modeling
Across five commercial projects, I worked alongside the ICATEM team on modeling, documentation, coordination, and technical support. I contributed to preparing base models, adapting prototypes, and organizing a library of resources useful for subsequent deliverables. At the same time, procedures were established for levels, coordinates, links, discipline organization, and information exchanges. These are small decisions, but they become critical when several people need to share a file without losing the context of what each element represents. Some activities also used Dynamo automations to simplify repetitive operations in Revit.
Turning experience into reference materials
An initial training session was not enough to support the change. I prepared a BIM manual adapted to ICATEM's needs, drawing on the client's requirements and materials; it brought together criteria for preparing, coordinating, and organizing models that the team could consult during the projects. I also developed instructional videos so certain modeling procedures would not depend on in-person explanations every time a question arose. The materials were not fully prepared before work began: they grew alongside meetings, progress, and questions that came up during the assignments. That approach connected training with problems the team was actually solving.
An implementation built into day-to-day work
By the end of the support period, ICATEM had reusable models and resources, documented procedures, and practical experience in collaborative work. The main contribution was not a demonstration file, but helping establish a way to develop subsequent projects. Technical work, documentation, and teaching advanced alongside project deliverables.