PROJECTS / SECTORS

Projects and sectors

Public projects and service spaces

Institutional and public-service buildings often bring together disciplines with different documentation and coordination needs. I worked on two projects associated with INE and two with the Judicial Branch, carrying out BIM modeling and coordination activities. In offices and services, my experience includes work for Banco Santander, which also involved digital delivery responsibilities. In healthcare, I contributed to modeling a hospital in Panama and the SEMAR Teaching Hospital in Mexico City. A hospital project in Nuevo León also involved digital delivery activities. These experiences all made use of models, but did not necessarily involve the same disciplines, phases, or responsibilities.

Industry, retail, and preconstruction

On commercial projects associated with Walmart, I was involved in modeling, coordination, and BIM implementation, which meant working on both deliverables and production procedures. In the industrial sector, my participation included modeling for a Construvita paper factory and modeling, coordination, digital delivery, and preconstruction work for Brembo. I have also contributed to digital deliverables for projects involving LEGO, Volvo, and Bobcat, as well as preconstruction and tender activities for Siemens, Mondelez, and Mabe. These are examples of how working with BIM information can shift between producing a model, preparing a deliverable, and organizing quantities for a stage before construction.

Infrastructure, airports, and other settings

Infrastructure references include the Mexico–Toluca Train, with modeling tasks; the Nuevo León Suburban Train and El Cuchillo II Dam, with modeling and digital delivery. In airports, I have worked on modeling for NAICM and for a project in Baja California. My experience also spans residential housing, the BeGrand tower, and modeling of the Four Seasons Casitas in the hospitality sector. Moving from one project type to another requires adapting to different representation criteria and information needs. I do not regard these references as a list of projects developed in their entirety under one person's responsibility. In each, I contributed to particular disciplines or stages. This diversity has helped me recognize which coordination, automation, or delivery challenges recur and which call for a response specific to each project.